References

Bridge Sava – green bridge

Gallery

Bridge Brubnjaci

BSZ bridge Brubnjaci

Gallerry

Bridge Konjska
  • reconstruction of the bridge

Gallery

Turopolje – Velika Gorica
  • L = 9,052 km

Gallery

Bridge Zorkovac
  • Replacement of corroded bridge parts
  • corrosion protection of construction

Gallery

Klara – Zagreb
  • L = 6,422 km

Gallery

Zdenčina – Jastrebarsko
  • L = 7,438 km

Gallery

Koprivnica – Botovo
  • L= 13,524 km

Gallery

Borongaj – Dugo Selo
  • L= 28,294 km

Gallery

Moravice – Skrad
  • L=16,5 km

Gallery

Zagreb – Green Bridge
  • L= 2x 307 m

Gallery

Synthetic flooring at level crossings

Works on installation of synthetic flooring at level crossings

Gallery

RH1 corridor

Work on the replacement of switches on RH1 corridor

Gallery

RH2 corridor

Work on replacing 5 switches on the corridor RH2

Gallery

  • Works on capital repair for facility adjustment of the KM, SS and TC devices on the railway line Dugo Selo-Botovo, railroad Križevci – Koprivnica.
  • Works on installing of the SS unit, trenches digging and laying of power cables and PHD pipes and installation of the devices in the remote control center Ogulin-Knin.
  • Works on the installation of the SS units for stations, SS units for train report, trench digging and power cables laying and PHD pipes laying between stations on the railway Oštarije – Knin.
  • Works on the harmonization of the contact network, and safety signalization and telecommunication devices with the overhaul of the railway Novska-Sisak-Zagreb GK, railroad Greda -Turopolje.
  • Works on the harmonization of the SS and TK devices with the overhaul of the railway Greda-Turopolje.
  • Work on the harmonization of the KM devices with the overhaul of the railway Greda-Turopolje.
  • Work on securing of 13 level crossings.
  • Electrical installation works on the modification of electric traction systems: electric installation works on the contact network on railway Moravice-Rijeka-Šapjane and Škrljevo-Bakar.
  • Works on the construction of the Distributive Telecommunication Infrastructure DTI, in railway station area on the railway Knin-Split.
  • Installing the contact network protection of lightning on the railway Ljubljana – Koper, railroad Divača – Rižana.
  • Work on the harmonization of power plants of the KM, SS and TC devices on capital repair of railway Lokve – Drivenik.
  • Repair of the foundations and corrosion protection of structures of the contact network for railroad sections on railway Nova Kapela – Garčin.
  • Works on the reconstruction of the overhead line equipment, of equipment for sectioning and equipment for contact network dismantling