Business Field: Railroad Overhaul

Building, overhaul, maintenance

WORKS ON OVERHEAD LINES, WORKS ON CRANE RAILS, WORKS ON SPECIAL GAUGE CONSTRUCTION

Established activity of the BF Railroad Overhaul is construction and capital repairs of overhead lines, stations and sidings, as well as carrying out any work on the mechanical track maintenance (constructing special machine-wagons for works on rail track), all kinds of works on the construction of crane rails and special designs of tracks, modification of switches and ties, welding of rails in the track and switches, ultrasonic testing of welds, reconstruction of overhead material, surveying and mapping of support works, assistance with snow and ice made formations, elimination of consequences of natural disasters and emergencies, making operational and technical documentation, and preparation of final and technical documentation for the test of works.


Completed Projects in the year 2013

  • Capital overhaul of the railroad Turopolje – Velika Gorica
  • Capital repair of the railroad Zagreb GK – Klara
  • Capital overhaul of the railroad Križevci – Koprivnica
  • Capital overhaul of the railroad Zdenčina – Jastrebarsko
  • Works on the railroad Čakovec – Mursko Središće – DG
  • Works on the upper structure of the railroad Zagreb GK – Dugo Selo
  • Work on the overhaul of the railroad Ogulin – Krpelj
  • Work on the railway Pleternica – Velika, railroad Požega – Velika
  • Work on the railway section Pleternica – Čaglin
  • Capital repair of the railway Zagreb GK – Rijeka, railroad Skrad – Moravice
  • Work on the finalization of the railroad Knin – Zadar
  • Reconstruction of the railway station Sisak
  • Reconstruction of the railway station Beli Manastir
  • Reconstruction of the railway station Solin Luka
  • Reconstruction of the railway station Plavno and Pađene
  • Replacement of cross-switches 1a/b 11 a/b on the railway station Zagreb GK
  • Replacement of switches on the railroad Zaprešić – Čakovec, inspection decision
  • Replacing switches on corridor Vb
  • Replacing switches on Corridor X
  • Replacing switches on whole railway network
  • Installing synthetic flooring on the level crossings
  • Dealing with special event on Ličko Lešće – Perušić
  • Dealing with special event on Malovan – Gračac
  • Works on the upper structure of the bridge Ličanka
  • Works on the upper structure of the bridge Rinovica
  • Works on the upper structure of the bridge Drava Botovo